Opening and closing checklist SOP

The opening and closing routine is where small businesses lose money in ways nobody notices: the register never balanced because a step was skipped, the alarm was set on the wrong day, the fridge was left on over a weekend. This template turns the routine into one checklist that is the same every time, so a forgotten step is visible and attributable. It is written for any business with a physical premises and a shift handover. The worked example covers a small cafe. Keep the list short enough to actually do — the failure mode of these checklists is that they grow until nobody reads them.

DocumentSOP-004
RevisionRev 1.0
Last reviewed2026-08-14
Ownerfreebizdocs.com

A single controlled checklist for opening and closing a premises or shift, so the same things are checked every time and a forgotten step has an owner.

Copy it, or print it and save as PDF.
SOP-004  ·  Rev 1.0
[OPENING AND CLOSING CHECKLIST SOP]

The opening and closing routine is where small businesses lose money in ways nobody notices: the register never balanced because a step was skipped, the alarm was set on the wrong day, the fridge was left on over a weekend. This template turns the routine into one checklist that is the same every time, so a forgotten step is visible and attributable. It is written for any business with a physical premises and a shift handover. The worked example covers a small cafe. Keep the list short enough to actually do — the failure mode of these checklists is that they grow until nobody reads them.

1.  PURPOSE
    > Note — One sentence on why this procedure exists.
    [PURPOSE]

2.  SCOPE
    > Note — Which shifts and premises this covers.
    [SCOPE]

3.  OPENING
    > Note — The steps to complete before the doors open, in order.
    [OPEN_1]
    [OPEN_2]
    [OPEN_3]
    [OPEN_READY]

4.  CLOSING
    > Note — The steps to complete at close, in order.
    [CLOSE_1]
    [CLOSE_2]
    [CLOSE_3]
    [CLOSE_CHECK]

5.  CASH AND RECORDS
    > Note — The money count and the handover record.
    [CASH]
    [HANDOVER_NOTE]

6.  EXCEPTIONS
    > Note — What to do when a step cannot be completed.
    [EXCEPTION]

Free to use in your own documents, including commercially.
1

Purpose

Note — One sentence on why this procedure exists.
Change bar — replace this

[PURPOSE]

Note — The outcome this opening and closing procedure guarantees.
2

Scope

Note — Which shifts and premises this covers.
Change bar — replace this

[SCOPE]

Note — The shifts or locations this checklist applies to.
3

Opening

Note — The steps to complete before the doors open, in order.
Change bar — replace this

[OPEN_1]

Note — The first opening step.
Change bar — replace this

[OPEN_2]

Note — The second opening step.
Change bar — replace this

[OPEN_3]

Note — The third opening step.
Change bar — replace this

[OPEN_READY]

Note — What must be true before the business opens.
4

Closing

Note — The steps to complete at close, in order.
Change bar — replace this

[CLOSE_1]

Note — The first closing step.
Change bar — replace this

[CLOSE_2]

Note — The second closing step.
Change bar — replace this

[CLOSE_3]

Note — The third closing step.
Change bar — replace this

[CLOSE_CHECK]

Note — The final check before locking up.
5

Cash and records

Note — The money count and the handover record.
Change bar — replace this

[CASH]

Note — How cash is counted and reconciled.
Change bar — replace this

[HANDOVER_NOTE]

Note — The note left for the next shift.
6

Exceptions

Note — What to do when a step cannot be completed.
Change bar — replace this

[EXCEPTION]

Note — Who to call and what to record if something is wrong at open or close.

Worked example

1

Purpose

Note — One sentence on why this procedure exists.
Change bar — replace this

To open and close the shop the same way every day, with every step checked and signed, so a skipped step is visible and has an owner.

2

Scope

Note — Which shifts and premises this covers.
Change bar — replace this

The weekday and weekend shifts at the High Street shop. The delivery van is out of scope.

3

Opening

Note — The steps to complete before the doors open, in order.
Change bar — replace this

Unlock the front door and disarm the alarm, then lock the door behind you.

Change bar — replace this

Turn on the lights, the till and the coffee machine; confirm the water is up to temperature.

Change bar — replace this

Count the float from the safe and confirm it matches the opening balance on the sheet.

Change bar — replace this

The shop is lit, the till is up, the float matches, and the first customer can be served.

4

Closing

Note — The steps to complete at close, in order.
Change bar — replace this

Wipe down the counters and the machine, and put away all food for the night.

Change bar — replace this

Run the end-of-day till report and count the cash against it.

Change bar — replace this

Turn off the lights and the machine, check the fridge door is closed, and set the alarm.

Change bar — replace this

Cash matches the report, fridge is closed, alarm is set, and the front door is locked.

5

Cash and records

Note — The money count and the handover record.
Change bar — replace this

Cash is counted against the end-of-day report, the difference is noted, and the takings go in the safe.

Change bar — replace this

The closing person leaves the float count and any issue for the next shift on the clipboard by the safe.

6

Exceptions

Note — What to do when a step cannot be completed.
Change bar — replace this

If cash does not match or a step cannot be done, call the owner and leave a note. Do not leave the shop unlocked to 'finish later'.

Copy it, or print it and save as PDF.

These documents are starting structures for you to build on, not professional or legal advice. Anything that will have legal or contractual effect, or that varies by jurisdiction, should be reviewed by someone qualified in the relevant place.

Why this process gets written down

This procedure is written because the task is repeated, it matters when it goes wrong, and it should not depend on one person's memory. The worked example above shows the same structure filled in for a real case, so you can see what a complete version looks like before you write your own.

Related variants are listed in the document's control area and on the SOP template page.

A

The Document Control Kit

Turn a folder of documents into something a team can actually find and follow

Every template on this site is free and stays free. The kit is what turns a folder of documents into a system you can actually run: a register with numbers, owners and review dates; who reviews what and how often; a numbering scheme that still works at fifty documents; and the thirty-day sequence for getting a team to use any of it, which is where most of these projects die.

What the kit holds

Register Column headings — number, title, owner, revision, approval date, review-due date
Review cadence Who reviews what, how often, and what triggers an off-cycle revision
Rollout plan The thirty-day sequence for getting a team to actually use the documents
Numbering scheme How to number documents so the system survives its first fifty
Open the control kit FREE · NO ACCOUNT · NO CARD · NOTHING SENT ANYWHERE

Opens a short sponsor step, then brings you straight back to this page with the kit open. Nothing you have entered goes with you.